Activate the Enphase IQ Combiner
Once you've completed steps 1 and 2 to reset the solar breaker and power the AC disconnect, you're ready for the final step. DO NOT BEGIN THIS STEP unless you have completed steps 1 and 2.
STEP 3: Turn on IQ Combiner breakers
-
The Enphase IQ Combiner may be located next to the electrical panel, meter, or the AC disconnect. Look for a small grey box labeled “Enphase.”
Note: If you instead see a white box labeled "SolarEdge," click here for step 3 instructions.
-
Inside the IQ Combiner box, flip all breakers to the center. There may be two (2) to five (5) breakers in this box.
-
The inverter may take a while to turn on, depending on the time of day. When the IQ Combiner/Envoy has connected successfully, the left-most LED light will be solid green.
Note: If none of the LEDs are lit, it is not powered on. Turn off and on the breaker and/or disconnect switch feeding the IQ Combiner. If the IQ Combiner fails to power up, contact us.
​
​
​
​
​
​
​
​
​
​
​
After You Activate Your Solar Energy System
The green lights indicate that your system is active but it takes a few days to confirm. If activation was successful, we’ll know in 1-3 days when performance data begins to appear.